Q4003 and Q4014 haul S56 loaded grain from Avon Yard to Kwinana QAF, seen passing through the Windmill Hill cutting.
VL 361 and VL 362 are on hire to CBH WA to assist with the Grain Harvest for 2018, seen here arriving at Kwinana
VL 361 and VL 362 are on hire to CBH WA to assist with the Grain Harvest for 2018, seen here arriving at Kwinana as a bauxite train heads to Alcoa
Last light.
Last light of the day.
CBH 121 leads the WATCO standard gauge grain towards Kwinana for discharge
CBH 122 and CBH 119 work S56 loaded grain train towards Kwinana