A rail train finishes their work in Soledad Canyon as their caboose brings up the rear of the train.
After working between Acton and Santa Clarita, the Rail Train is tied down at Saugus, showing off their unique consist.
The Metrolink Rail Train prepares to depart the Vincent/Acton station in the early morning with an F59, SW10 and GP9 for power.
A Metrolink Rail Train enters Soledad Canyon as they prepare for a day of work on the Valley Sub.
Metrolink's rail train slowly winds through Soledad Canyon dropping continuous welded rail with a crazy set of leased power including an F59PH, SW10, and GP9.