WSOR’s newly repainted SD60M leads the Chicago bound train over the Rock River bridge at sunset.
T004 shoves down the Milton industrial lead with a delivery of grain for United Ethanol.
T004 is just a few miles from Milton where they will make three separate setouts.
T004 rolls through Whitewater on a gorgeous sunny Saturday. The weather we've been experiencing in Wisconsin lately is pretty incredible. 70 degree temps in November are unheard of.
T004 cruises through Palmyra at 25 MPH. For years, there was a speed restriction of 10 MPH through town. Thanks to the recent welded rail project, that restriction has recently been lifted. Once t... (more)
WAMX 4171 and three other SD40-2s roll past the former depot at North Prairie. The building is now a restaurant which serves some pretty decent food.
WSOR T004 grinds up the hill at Williams.
The All American Express makes 30 MPH while crossing the Rock River. Soon, they'll be back in the eighth notch as they ascend the grade into Edgerton.
After setting out the manifest traffic and two engines, the T004R is now a unit military vehicle train. They're coming across the top leg of the wye in Milton to go from the Waukesha Sub to the Ma... (more)
A pair of non-dynamic SD40-2's lead the T004 train east towards Chicago. This train will eventually park somewhere until about 10 PM when the Chicago crew gets on the train and takes it towards th... (more)