With a new loaded train we see the 6993 and it's sister unit as the power for the South Akron Stone train as it sits ready for the call from National Lime and stone.
A pair of blues brothers set at summit street awaiting their return West after bringing the South Akron Stone train empties back from National Lime and stone.
As fall colors begin to take shape we see a idle Wheeling and Lake Erie empty stone train trying it's best to emulate it's surroundings as it waits to head back West to be reloaded
W&LE 6314 a former EMD Demonstrator rest with what will be soon the second stone train to head West to get reloaded on a side note, notice the former Wisconsin Central Locomotive as the last trail... (more)
Wheeling and Lake Erie/ Akron Barberton Cluster Railway South Akron Stone train awaits it's turn to head back West to get more stone for the National Lime and Stone Company.
South Akron Stone train ID Z-642 with a Akron Barberton Cluster Railway crew heads West while a beautiful sunrise happens in the East behind the consist.
One of the first South Akron Stone trains moves toward it's destination on a bright sunny March day
Akron Barberton Cluster Railroads South Akron stone train job blast past south street on a late afternoon run, lead by Wheeling and Lake Erie SD40-2 number 6985