The "Crocodile" Ce 6/8 II # 14253 of SBB Historic, built in 1919, pull the Gotthard adventure train 31421 from Erstfeld to Bodio, crossing the lower Meienreuss bridge between Gurtnellen and Wassen on the Gotthard north ramp. The concrete bridge (since 1962), cladded with stones, is 60 meter long with a main span of 38 meter.